正确施工安装济南广告牌设备

页面更新时间:2015-07-27 10:34 来源:未知 作者:admin 点击:

1、装济南广告牌下边框:装下边框要先卸下面盖放妥,从右至左或者从左至右依次安装,焊接码仔间距为500-600mm,无虚焊,焊渣必须清理干净,焊接时必须做好安全防护,刷上防锈漆,螺母锁紧,用水平仪检查,安装后下边框倾斜度≤0.3mm/m.

1, Jinan billboard frame: installed under the frame to discharge the following cover is properly placed, from right to left or from left to right are sequentially installed and Welding Code son spacing is, no weld, welding slag must be clean, welding must do a good job security, anti rust paint on the brush, a locking nut with level gauge to check, after installation frame tilt angle is less than or equal to 0.3mm/m.

2、装济南广告牌左右边框:装左右边框要先卸下面盖放妥,吊线垂直由下往上安装,焊接码仔间距为800-1000mm,无虚焊,焊渣必须清理干净涂上防锈漆,左右边框垂直度≤1mm/m.

2 and put the Jinan billboards around the border: About loaded border to unload first below the cover is properly placed, hanging vertically from the bottom to installation, welding code son spacing 800-1000mm, no weld, welding slag must be clean coated with anti rust paint, left and right border verticality is less than or equal to 1mm/m.

3、装济南广告牌上边框:装下边框要先卸下面盖放妥,装上边框应采用多根三棱柱每隔1500mm为单位,作上、下边框水平距离的参照标准,从左至右或从右至左依次安装,焊接码仔间距为500-600mm,无虚焊,焊渣必须清理干净,刷上防锈漆,螺母锁紧,用水平仪检查,安装后上边框倾斜度≤0.3mm/m.

3, put Jinan billboards border: installed under the frame to discharge the following cover is properly placed, mounted on the frame should be as a unit, reference standards for the upper and lower frame level distance, from left to right or from right to left, are sequentially installed, welding code son spacing is by a plurality of prism every 1500mm, no weld, welding slag must be clean, anti rust paint on the brush, a locking nut, level instrument check, a border after the installation of the dip slope is less than or equal to 0.3mm/m.

4、装三棱柱:1,安装三棱柱要求三个工人相互配合,由下方工作人员先用带绳铁钩钩好三棱柱上方的小孔,绳子另一头系在钢架上,工作人员往上拉;2,根据客户要求的翻动形式来确定三棱柱安装,先装上面再装下面,所有三棱柱的中心点及间隙必须保持一致,偏差低于正负2mm;3,每条三棱柱上方和下方各有一个小孔,锁两个直径3.5×10mm自攻螺丝固定;4,为了画面的平整,用1.5m长的水平尺作为工具, 调节扭簧座平面尼龙螺丝,用十字螺丝刀依次调整平面.

Center staff below 4, three prism: 1, the installation of three prism three workers cooperate with each other, the first rope hook hook tri prism above the hole, the rope another head of department in a frame, staff to pull; 2, according to customer requirements changes the form to determine the three prism installation, first installed above and then loaded below, all three of the prism and the gap must be kept consistent deviation is less than plus or minus 2mm; 3, each prism above and below each have a hole, lock with a diameter of 3.5 * 10mm self tapping screws fixation; 4, to screen smooth, with 1.5m long horizontal ruler as a tool to regulate the torsion spring seat plane nylon screws, using cross screwdriver in order to adjust the plane.

5、贴画:1,采用贴画架将三棱柱依次排好,用工业酒精清洁三棱柱表面;2,将画直接表贴在三棱柱上,画面平整、光滑、无皱褶、无错位、无粘连、无气泡,贴好后用美工刀顺着棱边切割并按顺序在每根三棱柱下方编号;3,用酒精清洁画面的污秽及灰尘、手印等(严禁使用腐蚀性或油性产品清洁三棱柱).

5, stickers: 1, the sticker will be tri prism was ranked good, with industrial alcohol to clean the triangular prism surface; 2, the painting will be directly attached to the prism, screen smooth, smooth, no wrinkles, no dislocation, no adhesion, no bubbles, good paste with knife along the edge cutting and sequentially in each triangular prism below number; 3, using alcohol to clean the screen of pollution and dust, fingerprints, etc. (forbidden use corrosion or oily product cleanliness tri prism).

6、安装济南广告牌 http://www.xiongdiguanggao.com/ 动力系统和控制系统:1,电机螺丝必须锁紧,接线正确,绝缘良好,在没有安装链条的情况下通电检查电机运转情况(包括电机转动的方向、噪声等).链条的松紧要适中,链轮和链条安装完毕要加润滑油,电机防水罩安装稳固;2,电箱安装稳固,接线正确,接近开关离感应信号源距离控制在2-4mm之间.

6, the installation of Jinan advertisement dynamic system and control system: 1. Motor screws must be locked, the wiring is correct, good insulation, in the chain is not installed through checking the electric motor works (including motor rotation direction, noise, etc.). The tightness of the chain should be moderate, chain wheels and chains installed to add lubricating oil, motor water-proof cover installed solid; 2, electric box stable installation, wiring is correct, close to switch from the induction signal source distance control in 2-4 mm.